Pre-Project Projects |
|||
Design
intent/summary (1.8mb .PPT) |
|||
we dropped about 6 trees for
this, resulting in about 4 cords of campfire wood !! (note Axe head
vs. Alec's eye's !!) |
|||
Before : front |
Before : rear |
||
Foundation (1st Choice Concrete)
Ground break 3/8/2006 To achieve the 8ft ceiling height we had to undermine the existing footing. This resulted in a HUGE support wall |
|||
Backfilled and completed 3/28/06,
Excellent job, graded yard, square/level with .25inch !! |
|||
Framing begins; Set/Level sill
plates on 4/2/06, closed in 6/16/06 (4 weeks lost to incompetent hired
help) |
||||
Windows and siding (siding 12/12/06)
and future deck |
|||
Inside happenings |
||||
Basement, deck and patio |
|||
|
Siding Project
|
||
Miscellaneous and general |
||||